Unincorporated Lee County
Start with county Building & Permitting Services. Its Application & Information Center links to eConnect, project guides and forms.
Lee County · Southwest Florida
Preparing a building permit application or working through review comments? We help identify the right authority, organize the submission and follow the file. Start with the local decisions that affect your project.
Independent permit coordination. English and Spanish. Most work is remote, with client meetings when needed.
Choose the Right Application Route
Confirm the property’s jurisdiction before selecting forms or creating an application.
Start with county Building & Permitting Services. Its Application & Information Center links to eConnect, project guides and forms.
The city’s electronic permitting page links to EnerGov for applications and revisions, and to its “Am I in the City?” boundary tool. For a commercial project, see our Fort Myers permit coordination page.
Use the city’s CSS permitting guidance to locate its Permit Document Center and application portal. County instructions should not replace the city’s project guidance.
Lee County’s Permit Center also directs projects within Bonita Springs, Estero, Fort Myers Beach and Sanibel to check their municipal route. If the boundary is unclear, give the department the address and parcel information and confirm the authority before submitting.
We research the property’s application route and organize the next submission around the responsible department’s instructions.
Match the Documents to the Work
These county guides help identify the application and supporting documents for the proposed work. Use municipal guidance when a city handles the permit.
Separate work inside an existing home from work that adds floor area. The county’s residential guide distinguishes alterations, additions and accessory structures. That choice helps establish the application scope.
The commercial guide includes tenant buildouts and other alterations. Describe the existing and proposed use, and coordinate the plans for the work involved. A commercial project can involve more than one permit.
Start with the roof guide for the proposed replacement, repair or re-covering. A change in roofing material can affect the supporting information; for example, the guide identifies engineering approval when adding tile to a structure that did not have tile.
Confirm whether the work replaces an opening at the same size or changes the structure. The county distinguishes size-for-size replacement from work such as enclosing a lanai, which follows an alteration route.
Use the county’s pool guide to review the residential or commercial application path and its supporting documents. Identify the pool work clearly when discussing the project.
We help organize the application, supplied plans and supporting records for the selected scope. The owner, contractor and design professionals provide the documents and technical answers required from them.
For another type of building work, use the county’s current guide and form directory. Requirements depend on the scope; one checklist does not cover every project.
Check Before Finalizing a Repair Application
For a property in a regulated flood area, repairs or improvements may require a flood-compliance review. Lee County’s Substantial Improvement / Substantial Damage guidance explains the role of required elevation, building value and work cost.
Before preparing the package, check the flood information, any elevation certificate and the detailed scope and cost records. We help organize those records for review. The responsible authority determines what applies; a municipal property needs its own authority’s guidance.
Do not assume an existing roof or trade permit covers every new repair. The county’s Disaster Recovery guidance distinguishes damage within the existing record type from work that requires a different type.
Compare the approved scope with the added damage. We can organize the permit history and repair description for the department to confirm the revision or application route. Check current disaster instructions before relying on temporary procedures.
Find the File and the Outstanding Item
For county records, the eConnect access guide lists public searches by address, parcel or record number, plus permit status and inspection results. Viewing attachments and correction comments, uploading documents and submitting applications require registration. For a municipal permit, use that city’s record system.
The county’s eConnect user guide (PDF) explains document upload stages and standards. Review the live record before uploading; the correct location and available actions can depend on its stage.
Our permit research and permit follow-up services help organize the file, responsibilities and next action. A status lookup does not establish that past work is compliant.
Continue Through the Final Record
The county’s inspection page lists eConnect, phone and text options. It also notes that some barrier islands, including Captiva and Boca Grande, have inspections on specific days. Confirm availability when planning work there.
For projects needing a county fire inspection, the published process includes coordination with the local fire department. Review that step with the responsible project parties.
A passed inspection may leave other conditions outstanding. The residential guide describes checks for related inspections, required certificates and other project conditions before a Certificate of Compliance or Certificate of Occupancy is issued.
We help track open items and the available closing records. Confirm the final requirements and status for the specific permit with the responsible department.
Get Help With Your Next Submission
Tell us what you want to build or which step is unresolved. We will review the available information and define the coordination work.
This is our intake list. The government document checklist depends on your project. Start with a brief description through our contact form; we will explain the next document step. Keep sensitive personal and financial information out of the initial form.
For the broader application sequence, see our Florida building permit guide. Learn more about Building Permits Florida and our service areas.
Before You Apply
Confirm jurisdiction first, then use that authority’s instructions. Cape Coral and Fort Myers publish their own municipal application routes. We can help organize the submission around the correct department.
Describe the complete work before selecting the application. Lee County’s exterior openings guide treats size-for-size replacement differently from structural alterations. Use the scope to confirm the proper record type with the authority.
Send the authority, number and latest notice for an initial review. We can help identify the current stage, organize outstanding comments and clarify who needs to supply the next response.
No. Our service scope and fee depend on the work and the available file. Government fees, review requirements and agency timing must be confirmed for the specific application.
Tell us the property location, proposed work and current status. We help organize new applications, correction responses and permit follow-up in Lee County.
Building Permits Florida is an independent company. The responsible authority determines permit requirements, approvals, inspections and agency timing.